Electrical permits and homeowner DIY rules
Inside the City of Decatur, a separate electrical trade permit is required when you install, enlarge, alter, repair, remove, convert, or replace an electrical system, regardless of project value. Applications are accepted only through Community Core — the city no longer takes paper, email, or in-office permit applications. The adopted FY 2025–26 fee schedule (approved June 16, 2025) lists a $90 minimum electrical permit, plus itemized device and service charges, and a $25 e-permitting and digital plan review fee per item. Homeowners who want to act as their own contractor must file the city’s Homeowner Permit Letter of Indemnification Affidavit. This page is for the City of Decatur only; unincorporated DeKalb County is a different AHJ.
The city’s How to Obtain a Permit page states that requirements come from Unified Development Ordinance §10.1.1, and that separate trade permits are required when installing, enlarging, altering, repairing, removing, converting, or replacing any electrical system, regardless of value. Building permits are also required for constructing, enlarging, altering, repairing, moving, demolishing, or changing the occupancy of a structure, for repairs and maintenance valued at $1,000 or more, and for roofing or structural work. If you are only sure that electrical work is involved, plan on an electrical trade permit and ask Design, Environment and Construction whether a building permit is required as well.
The city publishes a Homeowner Permit Letter of Indemnification Affidavit for an owner who wants a homeowner permit and will serve as general contractor. The affidavit requires that the building is on property the applicant owns, will be occupied by the applicant, and will not be used by the general public; that the applicant has not sold a building they constructed and contracted within the prior 24 months; and that the property is not to be offered for sale or lease as provided in O.C.G.A. § 43-41-17. If the applicant is not installing the electrical (or plumbing or mechanical) system as the building owner, the affidavit requires them to hire properly licensed contractors and have those contractors secure the required trade permits. The Permit Requirements page also tells homeowners submitting a building permit to include the Homeowner as Contractor Affidavit, and tells trade-permit applicants to include business and state licenses. That language supports a homeowner applying for work they will actually perform, but it is not a blanket “any DIY electrical is allowed” statement. Confirm with permit staff at 404-377-6198 or [email protected] before you do the work yourself — especially for service equipment, new circuits, or anything beyond a simple device replacement.
Walk-in paper applications are no longer accepted. Use Community Core. Office hours below are for questions and general information.
The adopted FY 2025–26 Consolidated Schedule of Fees (approved June 16, 2025) lists a minimum electrical permit of $90, plus itemized charges. There is also a $25 e-permitting and digital plan review fee per item. The city calculates the total from the electrical fee table when you apply in Community Core. These figures are from the FY 2025–26 schedule; confirm they are still the current year’s rates.
| Item | Amount | Source note |
|---|---|---|
| Electrical permit, minimum | $90 | Listed as “Electrical permit / Minimum Permit – $90” and again on the electrical fee table. |
| E-permitting and digital plan review fee | $25 per item | Listed under Development fees in the same adopted schedule. |
| Residential outlets, switches, and lights | $1.20 each | Commercial outlets, switches, and lights are listed at $1.80 each. |
| Meter loops / temporary service pole examples | See schedule | The table lists amp-based charges for meter loops and temporary service poles (for example, 100 amps $12.00, 200 amps $19.20, 400 amps $30.00). Use the official table for the row that matches the work. |
| Reinspection | $60 | Listed under Development fees. |
| Starting work without a permit | Double the permit fee | Listed under Development fees. |
The applications page says fees printed on older permit forms may be out of date and to use the current year’s fee schedule. Ask Community Core or permit staff for the exact total before you pay.
City of Decatur Consolidated Schedule of Fees, adopted FY 2025–26 (June 16, 2025)
Yes, if you are installing, enlarging, altering, repairing, removing, converting, or replacing an electrical system. The city’s How to Obtain a Permit page says that trade-permit trigger applies regardless of value.
The city has a Homeowner Permit Letter of Indemnification Affidavit that lets an owner-occupant apply as general contractor on a home they will occupy and not offer for sale or lease, subject to O.C.G.A. § 43-41-17. If the owner is not installing the electrical system themselves, a licensed electrical contractor must get the trade permit. Confirm with city staff before you do the work yourself.
Only through Community Core at www.communitycore.com. Email [email protected] for first-time access. The city no longer accepts permit applications in the office, by email, or by mail.
The adopted FY 2025–26 fee schedule lists a $90 minimum electrical permit plus itemized charges (for example, $1.20 per residential outlet, switch, or light) and a $25 e-permitting and digital plan review fee per item. The city totals the fee in Community Core. Confirm that the FY 2025–26 schedule is still the current one when you apply.
Every factual claim on this page is drawn from the government pages below, last checked on the date shown. If a link has moved, start at the AHJ website.
Most electrical permits still end with a licensed electrician doing the work — or at least signing off on an inspection. When referral programs are activated, the buttons below will go to those partners. Until then, hire a licensed electrician who is registered with the local AHJ, and verify their license with the state licensing board.
Homeowner-to-pro quotes for electrical work, including panel upgrades, EV chargers, and generator hookups.
Referral pendingPay-per-lead contractor matching for home-improvement trades. Modernize also sells generator leads to contractors (install, hookup, transfer switch).
Referral pendingA reserved slot for a direct referral agreement with a licensed electrical contractor who already works in this jurisdiction.
Ready to activate